Toiles à rouleau pour écoles : liste de vérification pour entrepreneurs

Ouverture, essais au feu, sécurité des cordons et calendrier estival.

School projects have short install windows and long approval chains. Settling these points before the submittal saves a round of revisions.

Performance

  • Openness factor — 3% for rooms with interactive displays or sunny facades; 5% as the default
  • Blackout rooms — AV, music and multipurpose rooms; decide if side channels are needed
  • Fabric color — darker interior faces give better view-through and less glare

Code and safety

  • Fire test — fabrics tested to NFPA 701 (Canada: check the board's standard, often CAN/ULC-S109 or NFPA 701)
  • Cord safety — chain tension devices fixed to the wall, or motorized; no loose loops
  • Hardware — metal brackets and hem bars for daily use

Openings

  • Ribbon windows wider than 120 in — multi-band shades on one chain, or split by mullion
  • Clerestory and gym windows — motorized, on a key switch
  • Mounting depth at every opening, including window hardware

Schedule

  • Samples and submittal approved at least 10 weeks before the break
  • Field measurements confirmed; production released 4–5 weeks before install
  • Shades labeled by room number, delivered a week before the crew starts

We prepare submittal packages — spec sheets, fire test reports and a physical sample board — for school projects in the U.S. and Canada.

Demander un devis

Parlez-nous de vos fenêtres.

Envoyez des dimensions, une liste de fenêtres ou quelques photos. Réponse en un jour ouvrable.

Vos données servent uniquement à répondre à cette demande.

Discuter sur WhatsApp