Toiles à rouleau pour les classes d’une école primaire en Ontario
148 toiles solaires et occultantes, mesurées au printemps et installées pendant l’été.

Enjeu
Glare on interactive displays was the main complaint from teachers. Classrooms had long ribbon windows that exceeded a single shade width, the gym had clerestory windows 20 ft above the floor, and everything had to be installed in the eight weeks of summer break.

Solution
We prepared a submittal package — spec sheets, NFPA 701 test report and a physical sample board — for the school board’s approval in April. Ribbon windows were covered with multi-band shades linked on one chain so each run operates as one. Chain loops are held by wall-fixed tension devices. The gym clerestory got hardwired motors on a key switch, with wiring diagrams sent to the electrical contractor in May.
Résultat
Shades arrived on site a week before the break began, labeled by room number, and the contractor’s crew installed all 148 in eleven days. The board has added two more schools to next summer’s program.
Galerie du projet2