Persianas enrollables para una escuela primaria en Ontario

148 persianas screen y blackout, medidas en primavera e instaladas en verano.

Persianas enrollables para una escuela primaria en Ontario
Sector
Educación
Ubicación
Ontario, Canada
Año
2025
Cantidad
148 estores
Producto
Persiana enrollable screen comercial Meridian, Persiana enrollable blackout comercial Meridian, Persiana enrollable motorizada Quiet — cableada
Project type
Education — school renovation
Application
Classrooms, library, gymnasium
Quantity
148 shades
Product
Meridian Sunscreen 3%; Meridian Blackout; hardwired motors for gym clerestory
Fabric
Sunscreen 3% in Grey; blackout in Charcoal; NFPA 701 tested
Customization
Multi-band shades on one chain for ribbon windows; wall-fixed chain tension devices
Installation
General contractor’s crew, during summer break
Coordination
Submittal package and sample board approved by the school board
Technical support
Wiring diagrams for 6 gym motors; video call with the installer on day one

Reto

Glare on interactive displays was the main complaint from teachers. Classrooms had long ribbon windows that exceeded a single shade width, the gym had clerestory windows 20 ft above the floor, and everything had to be installed in the eight weeks of summer break.

Solución

We prepared a submittal package — spec sheets, NFPA 701 test report and a physical sample board — for the school board’s approval in April. Ribbon windows were covered with multi-band shades linked on one chain so each run operates as one. Chain loops are held by wall-fixed tension devices. The gym clerestory got hardwired motors on a key switch, with wiring diagrams sent to the electrical contractor in May.

Resultado

Shades arrived on site a week before the break began, labeled by room number, and the contractor’s crew installed all 148 in eleven days. The board has added two more schools to next summer’s program.